1. Dollar Mines 4 & 5 – A brief history


- Drift for both mines started to be dug in 1956.
- Drifts completed in 1960.
- Drifts approx 900m long.
- Bottom of drifts at 180m below the River Devon at this stage.
- Coal seam was the “Upper Hirst Seam” and approx 1.8 – 2.4m thick.
- Coal of poor quality, only used for Power Station furnaces.
- Efforts were made to connect this mine to Solsgirth complex.
- Solsgith had an 18 Km underground conveyor system directly to Power Station.
- This was not possible due to complex faulting in the ground structure.
- All coal delivered to Power Station on BR Main Line railways.
Brief Statistics of Mine
- Typical Coal face length approx. 70m.
- Face advanced 22 – 24m per week
- At maximum production 2000T of coal mined per 24hr (3 shift working)
- This was a record production amount.
- Average production 67cwts per man shift.
- No 5 mine furnished with a man riding rail car system.
- No 5 mine furnished with an air lock and air extraction fan house.
- Pithead baths and showers increased in capacity from 250 to 400 men.
- Railway siding and handling capacity increased to 2500T per day.
- Every 3 weeks the following extensions needed to be undertaken.
- Electrical extensions involving 24 panels and gate boxes.
- Stage Loader extension.
- Main belt conveyor extension.
- Main transformer moved every 6 weeks.
- Staff employed
- 32 managerial staff
- Safety Officer
- Training Officer
- Materials control Officer
- Chief Mechanical Engineer
- Chief electrical Engineer
- 6 Office Staff
- 17-man Mechanical Maintenance team.
- 11-man Electrical Maintenance team.
- Machinery Equipment employed
- 30” Armoured Flexible conveyor with 3 x 50HP motors
- 2 x 24” Stage Loaders with 3 x 40HP motors
- 1 x Manumatic controlled 60” Disc Shearer wit 125HP motor
- Electrical control system.
- 40 x Dobson 25T hydraulic roof support Jacks
- Coal transport and handling equipment
- Sutcliffe trunk conveyor 60 HP motor
- Underground coal storage bunker 18ft diameter, 50ft deep, 300T
- Main mineral haulage
- 3-rail 42” gauge system with by-pass
- 21T drop bottom mine cars, 4/5 hauled per trip
- Hauled by balanced direct rope with 350HP at 71/2 mph
- Vibro-feed sieve system
- Coal crushed to 1” size with 36/42” flex-tooth crusher 90HP
- Mainline haulage 24T drop bottom wagons